The LGV Sud Europe Atlantique (LGV SEA), also known as the LGV Sud-Ouest or LGV L'Océane, is a high-speed railway line between Tours and Bordeaux, in France. It is used by TGV trains operated by SNCF, the French national railway company. It is an extension of the LGV Atlantique. The line was inaugurated on 28 February 2017 and entered service on 2 July 2017. The line was built by consortium LISAE, which will be responsible for operating and maintaining the line until 2061.


Video LGV Sud Europe Atlantique



Purpose

The LGV SEA brings high-speed rail service to southwestern France and connects the régions of Nouvelle-Aquitaine and Occitanie with the high-speed rail service of Northern Europe, which connects Paris to London, Brussels, Amsterdam and beyond. The trip between Paris and Bordeaux will take around two hours and ten minutes at a projected speed of 300 km/h. The inter-city links between Tours, Poitiers, Angoulême, and Bordeaux will also be improved and southwestern France will be better connected to various parts of the country and to the rest of Europe.

The project is also a response to the heavy traffic on the existing rail line. Train tracks are most efficiently used when all trains circulate at the same speed and have identical stops. The large speed difference between the fast TGV trains, which circulate on the existing tracks at speeds up to 220 km/h, and the slower freight trains and TER (regional) trains, which share the same track, causes the interval between these trains to increase greatly. This congests the tracks and prevents their most efficient usage.

Dedicated tracks for the TGV therefore leave space on the existing tracks for many more freight and TER trains than just the number of removed TGV trains. New regional TER services will become possible, and could ease services that are currently crowded. The increase in freight trains on the existing track would ease truck traffic on the roads in the régions, as trains transport more and more goods, easing the impact on the environment as well.

The project was also sold as benefiting the economy. The construction of Phase 1 is expected to create 10,000 construction jobs a year for five years. Jobs in the transport, commerce, and service sectors are expected to be created as well. Local businesses may their see competitiveness increase as their markets expand, and tourism to the region may increase as well.

This route will supplement - and partly supersede - the classic Paris-Bordeaux railway line.


Maps LGV Sud Europe Atlantique



Details

The line was built by consortium LISEA consisting of Vinci Concessions (Vinci SA subsidiary) - 33.4%, Caisse des dépôts et consignations - 25.4%, Meridiam - 22.0% and Ardian - 19.2%. The consortium will operate and maintain the line until 2061, and will charge tolls to train companies. The consortium invested EUR3.8 billion, French government, local authorities and the European Union paid EUR3 billion and EUR1 billion was contributed by SNCF Réseau (subsidiary of SNCF.Another EUR1.2 billion was spent by SNCF Réseau on the construction of interconnecting lines, control centres, capacity enhancements at Bordeaux and remodelling the track layout at Gare Montparnasse.

The new high-speed route bypasses Libourne, shortening the total distance traveled compared to the existing route. No new train stations were built between Saint-Pierre-des-Corps and Bordeaux, service to Châtellerault, Poitiers and Angoulême will use existing train stations, with connections allowing access to the high-speed rails. South of Poitiers, a connection allows trains to access the old tracks towards La Rochelle.

The journey between Tours and Bordeaux will be shortened by around 50 minutes. 302 km of high-speed track was built together with a further 38 km of conventional tracks that connect to the LGV. The new line is expected to increase annual ridership by about five million travellers.

Phases

For financial reasons, the project was initially divided into three phases:

Phase 1: Angoulême-Bordeaux

  • 2001-2003: Pre-project studies and procedures
  • 3 February 2005 - 16 March 2005: Final public hearings
  • Start of 2012: Construction starts
  • 31 July 2017: In service

Phase 2: Tours-Angoulême

  • 2004-2006: Pre-project studies and procedures
  • 2009: Preliminary works and land acquisition
  • Start of 2012: Main construction starts
  • 31 July 2017: In service

In that initial plan, Phase 2 had to be completed on a rapid schedule to cope with the increased in traffic expected after the opening of Phase 1. For this reason the French government announced additional funding in February 2009 to build Phases 1 and 2 together.

Phase 3: Bordeaux - Spanish border

  • Proposed, not currently decided.
  • 2004-2005: Preliminary studies
  • 2006: Public debate

On 30 July 2010, the French government announced that work on the section to the Spanish border is expected to begin before 2020. In 2015 however, a public inquiry rejected the construction of this section due to cost.


Presidential inauguration for LGV Sud Europe Atlantique - Railway ...
src: www.railwaygazette.com


History

  • 25 September 1990: Service began on the south-west branch of the LGV Atlantique to Saint-Pierre-des-Corps, west of Tours
  • 1 April 1992: Initial proposals for a high-speed link between Saint-Pierre-des-Corps and Bordeaux. Early in its conception, the line was going to be called LGV Aquitaine.
  • 1994-1995: Public debate on the LGV Aquitaine project
  • 1997-1998: Preliminary studies on the Tours to Bordeaux line
  • 2011: A 50-year concession to build and operate the line is awarded to the LISEA consortium.
  • 1st quarter 2012: Construction begins, expected to last 73 months (until 1st quarter 2017)
  • 28 February 2017: Inauguration of the line
  • 2 July 2017: Line opens commercially

Ligne à Grande Vitesse Tours-Bordeaux : un chantier pharaonique ...
src: i.ytimg.com


References


Forum SARA • Afficher le sujet - LGV Sud-Europe-Atlantique (3 ...
src: ludovic.fouche.free.fr


External links

  • Large parts of this article were translated from the article LGV Sud Europe Atlantique on the French language Wikipedia.

Source of the article : Wikipedia

Comments
0 Comments